Name: Robert Pines
E-mail: btpino40@gmail.com
Employed as: Other, non-employee, for N/A
Posted: 24 February 2012
NOMO--First I need to find out from somebody that has done signals to
tell me the % of the crossings is rip off to know how many years ago
the signals would have went in if the rip offs hadn't occurred. Reckon
Mr. Doe would know someone like that. I;m thinking anything this year
would have been in 10 years ago which makes it negligent homicide on
the railroads part. Oh ---$300,000 of the $520,000 is to fix the
approaches. I bet the driver didn't know the approaches were bad.
http://safety.fhwa.dot.gov/xings/com_roaduser/07010/sec04b.htm This
chart might be clearer.
http://www.cityoflewisville.com/main/citycouncil/agendas2010/ca09202010Backup.pdf
6’ x 8’ STEEL BUNGALOW, with GCP UNIT and SEARII Reporting Unit, with
Modules & Program required to control warning devices as shown,
Chargers & Battery necs., etc $ 54,217.00
FLASHER & GATE SIGNALS, with 12” LED Lights, All Aluminum Gate Arms,
LED Gate Lights, Signs, Bells, with any side lights as per State
Specifications. $21,316.00
SIGNAL GROUND MATERIAL, Foundations, Underground Wire & Cable, Guard
Rails, Multi Shunt Boxes at approaches, Track Connectors, Bond Wires,
wiring materials, etc. $ 21,677.00
Freight Charges $ 4,361.00
10% Material Contingency Fee $ 9,721.0
PROJECT MATERIAL, Cover Rock or Fill Material necessary, 220 Volt AC
Service Pole, Directional Boring with 4” PVC Pipe as determined by
Railroad, etc. $ 34,000.00
MATERIAL SUB TOTAL = $ 145,292.00
KCS LABOR with Additives, all Signal Dept. Personnel required for
Administration, and for Field Installation, testing and cut-over as
directed by the Signal Engineer. $ 40,777.00
EQUIPMENT CHARGES, for Signal Dept Pickup Trucks, Backhoes, Boom
Trucks, etc. $ 12,285.00
KCS PERSONAL EXPENSES, for all Signal Dept Personnel $ 6,230.00
CONTRACT ENGINEERING, for Layout Design, Quote Plans, Material Lists,
Layout Plans & Estimate, Shop Wiring & Field Construction Plans as
directed by the RR (JaKay) $ 17,500.00
CONTRACT ACCOUNTING, Project Cost Tracking System through the life of
the project, Completion Reports and assist Accounting with Final
Billing preperation. (BHS) $ 5,000.00
UTILITY COORDINATION, arrangements for new electrical service,
relocation of utilities, arrange for rock & fill material, project
coordination as directed by the RR (JaKay) $ 3,500.00
FIELD INSTALLATION CONTRACTOR, to provide equipment & personnel as
required by the KCSR Field Installation Bid Request package for the
signal installation. NO CHARGE
LABOR SUB TOTAL = $ 8 5 , 2 9 2 .0 0
$ 230,584.00